Categories
Categories
Warehouse: United States

Leviton 2O208-12W Submeter Outdoor 120/208V 3-Phase 4-Wire Max 1200A 3-Split Core Current Transformers, Electric Meter Kit

SKU: 2O208-12W Leviton

Special Order Item

This item is available by special order. Lead times may vary. Please contact us for availability and estimated delivery.

Image of LV-2O20812W
Product images for Leviton 2O208-12W Submeter Outdoor 120/208V 3-Phase 4-Wire Max 1200A 3-Split Core Current Transformers, Electric Meter Kit. 1 image(s) available. Click on image to view full size.

Key Features

  • Revenue-grade accuracy for dependable billing, cost allocation and energy reporting across 120/208V 3-phase, 4-wire installations
  • Outdoor-rated kWh meter kit with three split-core CTs for fast retrofit installation and reduced downtime
  • Supports up to 1200A capacity to monitor tenant loads, critical equipment or entire distribution branches
  • Enables effective load management, measurement & verification (M&V) and LEED tracking to cut energy costs
  • Streamlines maintenance and monitoring workflows—ideal for facilities, security, and surveillance power planning

Quick Specifications

Product Model
2O208-12W
Brand Name
Leviton
Product Name
Submeter, Outdoor, 120/208V, 3 Phase 4 Wire, Max 1200A, 3 Split Core Current Transformers, Electric Meter Kit
Manufacturer Part Number
2O208-12W
View Full Technical Specifications

Product Information Tabs

Overview

Optimize energy visibility and billing accuracy with the Leviton Series 2000 submeter—designed for commercial and industrial sites that require revenue-grade measurement and straightforward installation. This Leviton submeter kit is built for 120/208V 3-phase, 4-wire systems and includes three split-core current transformers to simplify retrofits and reduce electrician labor. With a maximum 1200A capacity, it captures precise kWh data for tenant billing, load management, and preventive maintenance.

Beyond basic metering, the outdoor-rated meter kit supports facility monitoring use cases including security and surveillance power oversight, UPS load tracking, and energy benchmarking for LEED projects. The split-core CTs let you install the metering solution without de-energizing panels, minimizing operational disruption. Revenue-grade accuracy ensures trustworthy data for billing, audits, and measurement & verification efforts.

Specify the Leviton 2O208-12W for projects that demand reliable energy monitoring, simple installation, and scalable load visibility. Add this submeter to your next retrofit or new-build plan, or contact your Leviton supplier to discuss integrative monitoring and security power applications.

Features

  • Revenue-grade accuracy for dependable billing, cost allocation and energy reporting across 120/208V 3-phase, 4-wire installations
  • Outdoor-rated kWh meter kit with three split-core CTs for fast retrofit installation and reduced downtime
  • Supports up to 1200A capacity to monitor tenant loads, critical equipment or entire distribution branches
  • Enables effective load management, measurement & verification (M&V) and LEED tracking to cut energy costs
  • Streamlines maintenance and monitoring workflows—ideal for facilities, security, and surveillance power planning
General Information
Brand Name Leviton
Product Name Submeter, Outdoor, 120/208V, 3 Phase 4 Wire, Max 1200A, 3 Split Core Current Transformers, Electric Meter Kit
Manufacturer Part Number 2O208-12W